Top rated |
The Control Office485 viewsA shot inside the control hut on the end of the turntable. You can see the panel which the little plastic folk use to control the turntable.     (1 votes)
|
|
|
Site Of the Saw Mill566 viewsThe location of where the sawmill will be.     (1 votes)
|
|
The station glued in570 viewsThe station was then slightly modified. The Advert board was shrunk, and some luggage added.     (1 votes)
|
|
|
|
The River442 viewsThe river has been extended futher on into the layout.     (1 votes)
|
|
Mostly finished Turntable.494 viewsJust a few general shots of how the bridge looks on the layout and with the pit at its current level of detail.     (1 votes)
|
|
Rusting675 viewsThe track has been layed and wired on the front right 1/4 of the layout. It has also been given a coat of rust paint, the then brown sleepers were given a light overcoat of black to make them a deeper brown     (1 votes)
|
|
|
The Upper hill scatters dry650 viewsNow that the scatters are dry, I have taken some pictures. The colours have gone back to what they were before the glue darkened them. The natural light shows the colour variations that using multiple colours of scatters gives you     (1 votes)
|
|
|
|
|
|
Candyfloss Mountain602 viewsThe mountain has been covered with a layer of pink polyfilla.     (1 votes)
|
|
|
|
|
|
|