Last additions - September 2010 |
Turntable: Stage 8b317 viewsA test fit to make sure that the bridge still fits Sep 02, 2010
|
|
Turntable: Stage 8307 viewsOne of the two chassis will be covered with wood. On top of this and at this end will be located the control office for the turntableSep 02, 2010
|
|
Turntable: Stage 7b309 viewsAnd my heaviest loco placed on the track to ensure that it doesn't sagSep 02, 2010
|
|
Turntable: Stage 7314 viewsCentral cross beams/supports have been added to prevent the track from sagging under the weight of a trainSep 02, 2010
|
|
Turntable: Stage 6322 viewsThe start of the side walls have been built. The rest of the walls from the current level to ground level will be made of strip wood.Sep 02, 2010
|
|
Turntable: Stage 5326 viewsThe Track has been fitted onto the two chassis.Sep 02, 2010
|
|
Turntable: Stage 4344 viewsChecking that the Turntable Indexing System and Auto Reverser circuit board that I have designed will fit under the bridge.Sep 02, 2010
|
|
Turntable: Stage 3356 viewsAnd the temporary one removed.Sep 02, 2010
|
|
Turntable: Stage 2346 viewsTwo permenant beams have been fitted.Sep 02, 2010
|
|
Turntable: Stage 1463 viewsTemporary beam to hold two chassis in the correct place.Sep 02, 2010
|
|
|
|
|