Concrete Retaining Wall313 viewsThe main body of a scalescenes Concrete Retaining Wall.
|
|
Concrete Retaining Wall225 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
My loco Roster244 viewsAll Bachmann: An MDT Plymouth (right), an H16-44 Fairbanks Morse (Left), and the new GE44T (Middle)
All have been converted to Microtrains couplers (The GE44T having converted since this photo was taken).
|
|
Some Machinery230 viewsI have scratchbuilt some machinery (Generator) for inside the powerstation.
|
|
Concrete Retaining Wall217 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
Bachmann "MDT Plymouth"219 viewsHaving a quick spin on the now motorised turntable
|
|
Concrete Retaining Wall210 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
Cork Roadbed.216 viewsThe profile of the foam trackbed has been leveled and refined, especially around the pointwork (so they lie flat), and to make the gradient changes much smoother. Some areas are up to 15mm thick of cork (most areas are only 1.5mm) - just shows how much I've had to refine my carving.
|
|
Loco Roster on the Turntable235 viewsAll Bachmann: An MDT Plymouth (middle), an H16-44 Fairbanks Morse (Left), and the new GE44T (Right)
All have been converted to Microtrains couplers.
|
|
Cork Roadbed.210 viewsThe profile of the foam trackbed has been leveled and refined, especially around the pointwork (so they lie flat), and to make the gradient changes much smoother. Some areas are up to 15mm thick of cork (most areas are only 1.5mm) - just shows how much I've had to refine my carving.
|
|
An Overview of Progress204 viewsThe title says it all.
|
|
Cork Roadbed.225 viewsThe profile of the foam trackbed has been leveled and refined, especially around the pointwork (so they lie flat), and to make the gradient changes much smoother. Some areas are up to 15mm thick of cork (most areas are only 1.5mm) - just shows how much I've had to refine my carving.
|
|
Concrete Retaining Wall220 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
Another stack.234 viewsI've added another chimney to the powerstation, this one for the smoke, the other two are cooling towers.
|
|
Concrete Retaining Wall239 viewsThe main body of a scalescenes Concrete Retaining Wall.
|
|
An Overview of Progress187 viewsThe title says it all.
|
|
Concrete Retaining Wall251 viewsThe Wall is now completed. I have added all of the butresses, and capping stones. There just needs to be a staircase and walkway by the coal tower. Those I will add later. The wall wont be fixed in until i lay the trackwork
|
|
An Overview of Progress194 viewsThe title says it all.
|
|
An Overview of Progress190 viewsThe title says it all.
|
|
An Overview of Progress202 viewsThe title says it all.
|
|
|