| Category |
Albums |
Files |
 | Rail ShowsImages from Exhibitions, Full Size Railways, Narrow Gauge Railways, Galas, etc. |
|
6 |
261 |
|
 | Mine Layout:The Current Layout - This Also Fits on my Windowsill |
|
12 |
370 |
|
|
15 |
302 |
|
|
5 |
37 |
|
|
4 |
23 |
|
|
5 |
25 |
|
|
5 |
27 |
|
|
3 |
48 |
|
| T-Scale Disk:Layout not yet started. It will be a railway on an SD Memory Card. |
|
1 |
0 |
|
| 1,093 files in 58 albums and 9 categories with 0 comments viewed 8,798 times |
| Most viewed |
|
Finished (with train)135 viewsPretty much finished. Still awaiting the arrival of a new staircase to replace that evil ladder.
|
|
|
As is the Station105 viewsThe Custom made baslsa wood station was fixed into place with some wood glue.
|
|
|
The baseboard93 viewsThis baseboard is a simple 50cm square peice of 12mm MDF
|
|
|
The Upper hill scatters dry91 viewsNow that the scatters are dry, I have taken some pictures. The colours have gone back to what they were before the glue darkened them. The natural light shows the colour variations that using multiple colours of scatters gives you
|
|
| Random files |
|
Miners Camp/Power Station7 viewsThis area is now cut down into the thick foam block, taking the correct profile for the scenery and track beds.
|
|
|
EZ + Trucks4 viewsThe bachmann EZ-Command and a pair of b'mann coal hoppers.
|
|
|
The house is bricked8 viewsI have finally got around to adding some brick effect sheeting to the house, to cover up the ugly match sticks.
|
|
|
Wateer Inlet7 viewsThe end of the waster inlets have been cut away to make them point downward into the river.
|
|
|
The Kitbash in position9 viewsThe Kitbash build is complete, and here is a photo to show how it fits into the surroudings. The substation still needs painting and weathering to match the powerstation.
|
|
|
|
|
The small Weir3 viewsA weir was added to supply water to the kitchen and toilet blocks for the miners camp, which i am yet to add.
|
|
| Last additions |
|
Turntable Test Run2 viewsRun directly off of a 9v battery, it will run alot slower when connected to my indexing circuit board.Sep 02, 2010
|
|
|
Turntable: Stage 92 viewsThe base for the control office is completed.Sep 02, 2010
|
|
|
Turntable: Stage 8b3 viewsA test fit to make sure that the bridge still fits Sep 02, 2010
|
|
|
Turntable: Stage 83 viewsOne of the two chassis will be covered with wood. On top of this and at this end will be located the control office for the turntableSep 02, 2010
|
|
|
Turntable: Stage 7b3 viewsAnd my heaviest loco placed on the track to ensure that it doesn't sagSep 02, 2010
|
|
|
Turntable: Stage 73 viewsCentral cross beams/supports have been added to prevent the track from sagging under the weight of a trainSep 02, 2010
|
|
|
Turntable: Stage 63 viewsThe start of the side walls have been built. The rest of the walls from the current level to ground level will be made of strip wood.Sep 02, 2010
|
|
|
Turntable: Stage 54 viewsThe Track has been fitted onto the two chassis.Sep 02, 2010
|
|